Kulshan Pump Station Bar Screen Rehabilitation

Bid Award: October 10, 2018 - $465,475.14
Contractor: Harbor Pacific Contractors, Inc., Woodinville, WA

Construction Management: HDR Engineering, Bellevue, WA
Project Engineer: Darin Christen, PE, Senior Project Engineer
Contact Information: (360) 336-6204
Funding: Surface Water Utility


Additional Information

Sign up here for Construction and Road Closure Notifications

Project Description:
This project included furnishing and installing a replacement bar screen and hydraulic rake at the City's Kulshan Pump Station to remove debris that blocks the prescreen which is located in the wet well just upstream of the pumps. During large storm events the debris screen can become blocked and backup stormwater upstream of the screen. This is a fairly flat stream system and reducing backups on the pump station screen system will reduce upstream flooding issues.

Current Status:
his project was completed on January 30, 2020, in the amount of $465,475.14.